- Home
- Services
Services
Six residential offerings. Open a page for what’s included and how we usually stage the work — or start with Costs if you want ballparks first.
How we scope a job
Every quote starts with a site visit. We measure, talk through how you use the rooms, and put inclusions in writing before any deposit. Electrical and plumbing that need a licence are done by licensed trades under our supervision.
Typical timeline (guide only)
- Kitchen or bathroom: often 3–6 weeks on site once materials are locked
- Granny flat / addition: longer — design, approvals, and build stages vary by council and site
- Full home: staged room-by-room so you can keep living here where possible
Weather, lead times, and council conditions can move dates. We update you when something shifts.

Kitchens
Benchtops, joinery, and layouts that work day to day
Kitchen detail →
Bathrooms
Wet areas rebuilt clean and waterproof
Bathroom detail →
Granny flats
Secondary dwellings and garage conversions
Granny flat detail →
Outdoor
Decks, entertaining areas, outdoor kitchens
Outdoor detail →
Full home
Multi-room renovations under one plan
Full home detail →
Additions
Extra living space tied into the existing house
Additions detail →
